2017 Roadway Program

Harvey/Howard Avenue Reconstruction


Harvey Avenue from 39th Street to 41st Street, and Howard Avenue from 47th Street to 48th Street will undergo a concrete reconstruction.

This project will include the following components:

  • Complete removal of the existing roadway
  • Installation of new concrete roadway pavement, curb, and gutters
  • Repairs to existing sewer main
  • Installation of 288' of new storm sewer on Harvey Avenue
  • Removal and replacement of private walkways unless residents request otherwise
  • Driveway aprons will be removed and replaced to meet Village Code with standard concrete
  • Crosswalks within the scope of the project will be reconstructed to meet ADA standard
Specific information on how a concrete reconstruction will effect the area can be found on the "General Information for Road Construction" page.  The presentation and informational handout from the public meeting will be posted here once it is available.

The following maps outline the areas available for overnight parking during the project.
Harvey Avenue Overnight Parking Map
Howard Avenue Overnight Parking Map

2017 Reconstruction Project

Fair Elms Avenue Concrete Rehabilitation



Fair Elms Avenue, 53rd Street to the cul-de-sac, will undergo concrete rehabilitation.  Concrete rehabilitation is an extensive patching process targets concrete panels, joints, and damaged areas.  Similar projects were completed on northern sections of Fair Elms Avenue in 2015 and 2016.  The project will occur in two phases: the east lane and the west lane. Fair Elms Avenue will become a one-way street, northbound, for the duration of the project.

Residents with patching directly in front of their driveways may lose vehicular access for 7-10 days.  These patches will require the removal and replacement of a portion of the adjacent driveway apron. Residents at the following addresses are expected to lose access:

  • 5440 Fair Elms
  • 5437 Fair Elms
  • 5425 Fair Elms
  • 5308 Fair Elms
  • 5332 Fair Elms
  • 5417 Fair Elms
  • 5305 Fair Elms
Residents who lose access are allowed to park on-street on adjacent side streets or in areas on Fair Elms that are free of construction equipment and do not block the flow of traffic.  
2017 Concrete Rehab Map