Weather permitting, the contractor A Lamp will start water main work on Rose Ave @ Oak St on Friday morning. The first work item is to make a connection of the new water main to the existing water system. Existing valves will be used to isolate the section to be worked on and at this time the Village does not anticipate the need for a water outage to complete the work. It is possible an existing valve may not close sufficiently and in such case a water shut down may be needed. If that occurs additional information will be distributed to each impacted home on Friday.